 Project Status

The Draft EIS was made available for agency and public review starting September 26, 2008. A Pubic Information Workshop and Public Hearing were conducted on November 12, 2008 to discuss the Draft EIS and solicit comments. The comment period for the Draft EIS closed on November 24, 2008. The FAA thanks everyone who participated and submitted comments.

The FAA is proceeding with Phase 3, the preparation of the Final EIS. The Final EIS is scheduled to be completed in 2010.

 
 Links
Federal Aviation Administration
Palm Beach International Airport

Summary of Public Involvement Opportunities during Phase 1 of the EIS (Scoping)

Scoping Meetings

As one of the initial steps in the EIS process, FAA conducted an Agency Scoping Meeting and Public Scoping Meeting on February 27, 2007 at the Hilton Palm Beach Airport. The following material was available at the Scoping Meetings:

 Introductory Video

 Scoping Meetings Handout

 Scoping Meeting Presentation Boards

The purpose of the Scoping Meetings was to present an overview of the Scoping and EIS processes, to describe the proposed projects under FAA consideration, and to obtain input from agencies and the public regarding the issues to be examined in the EIS. 

The Scoping comment period was from January 26, 2007 (when the Notice of Intent to prepare an EIS and hold Scoping Meetings was published in the Federal Register) through March 27, 2007.  FAA has summarized and cataloged all comments received during this period and considered them in the finalization of the EIS Phase 2 Scope of Work.  All original and summarized comments are contained in the Scoping Period Comment Database.

Although the Scoping comment period has closed, FAA will continue to accept comments and gather information throughout the EIS process. Any information received by FAA that it believes is critical to the environmental analyses will be included in the EIS.